CROSS-UK Newsletter 73
News
CROSS-UK Newsletter 73 has been published and includes expert comments on fire and structural safety reports.
Reports in this Newsletter cover the following:
- Modular construction design concerns
- Sudden collapse of 1850s stone balcony
- Horizontal mains used as a solution to meet vehicle access requirements
- Overloading of older multi storey and underground car parks
- Use of Table B3 of Approved Document B for loadbearing external walls
- Fraudulent use of calculations from another engineer
- Unusual steelwork connection discovered during fit-out works
- Student accommodation occupied before critical safety features commissioned
- Corrosion of heritage railing leads to a fall and a near miss
- Responsible Person failed to react appropriately to a smoke control system failure
- Poor electrical safety standards in fire alarm installation
- Concerns about solar PV installation
- Who should submit designs to comply with Approved Document Part A of the Building Regulations
- Fire safety concerns in a residential building
- Chemical attack on structural enclosures
- Compartmentation issues found in premises converted to residential flats
- Engineer asked to provide calculations for a dangerous refurbishment
- Performance of acoustic separation in a floor system
Comments
Add new comment